Skip to main content

Vertical timeline

Display dated records in a vertical timeline and configure cards, alignment, pagination, and the progress line.

Use a vertical timeline to display events from top to bottom. For example, a customer detail page can show calls, quotes, and confirmations in date order. A project page can use the same layout for milestone updates.

Adding a Vertical Timeline Control

In an approval form, data list form, or dashboard designer, open Advanced in the controls panel. Drag Vertical timeline to the area or container where the timeline should appear.

Configuring the Vertical Timeline Control

Select the timeline and open Content → Data. Choose the application and select a Data source. The application defaults to the current one. You can use a data list, document library, form report, or data report. Enter a fixed Title or bind it to the item’s data. For Point type, choose None, Icon, or Text.

Query Conditions

In Data filters, select Add condition and choose the field, comparison, and value. To show follow-ups for the current customer, use an expression for the customer value. For a fixed subset, enter a fixed value. Use Add condition group to combine rules with AND or OR. You can edit a condition or select its delete icon to remove it.

Sorting Filter

Set Primary order to the activity date. Use Secondary order to put items with the same date in a consistent order. If the page has a Sorting Filter control, link its variable to let users change the sorting. Sorting filter

The designer initially shows up to 20 nodes. Use Show more to inspect additional results, then check the pagination in preview.

Appearance:

  • Alignment and animation. Use Horizontal align to place the timeline at the left, center, or right of the cards. Use Vertical align to select start, center, or end. Turn on Animate cards to enable card animation.

  • View item form. Use the default layout, a custom list form, or a custom URL. Choose None to disable the detail link. Use Open in to choose Slide in, Pop up window, Full page, or New window when available. Choose a Size when available, such as Default, Large, Medium, Small, or Full screen window.

  • Visibility and empty results. Use Hide if value is empty to hide the timeline when the query returns no records, or set Fallback content. Dynamic display rules can show or hide the control based on other conditions. Dynamic Display Rules

Yeeflow vertical timeline settings with Animate cards, horizontal and vertical alignment controls, and the Dynamic display rules button.

Pagination settings

Set Start at to 0 to begin with the first result. Turn on Limit records to cap the total, or leave it off to include all matching records. Records per page defaults to 20. Check both the first batch and additional records in preview.

How to Use the Vertical Timeline Control

Connect the data source and add a Text, Container, or Image control inside one empty block. The layout is repeated for each record. Use the Expression Editor to bind controls to Collection item fields, such as the date or activity description. A fixed heading appears in every card.

Preview a customer with multiple follow-ups. Check whether each card shows its own record, the dates appear in the right order, and the detail action opens the correct item. Include a customer with no follow-ups to check the empty state.

Style Settings

Cards

Adjust Item gap, Spacing, alignment, and Content padding. Configure text and background colors, border, radius, and shadow for Normal and Hover. Set typography and colors for the Show more options control.

Point

Choose typography for the point text or icon, then adjust size, border, and radius. Set text and background colors for the supported states.

Line

Set Line color, Progress color, and Thickness. Adjust the border and radius to match the card design.

Title

Set margins, padding, typography, border, radius, and shadow. Choose the text and background colors for Normal and Hover.

Advanced Settings

Use Advanced to adjust the control’s shared properties. For cards users can browse from left to right, see the Horizontal timeline control. Advanced options · Horizontal timeline

Did this answer your question?